Abstract
There are structural and non-structural flood mitigation measures. Risk and uncertainty analysis is the foundation for designing and choosing appropriate flood mitigation options. The socioeconomic analysis is becoming increasingly important in the future.
Keywords: design return period, risk analysis, loading, capacity, mitigation measures